Permits

33,590 records, 42 fields. Permit Management (PM).

FieldColumnWhat it meansClassIn EnerGov (how sure)Filled
Permit IDpermitidEnerGov's internal ID for the permit, a GUID generated by the system. It never changes and links the permit to its inspections, fees, contacts and addresses.Tyler StandardPMPERMIT PMPERMITID (Table confirmed)100%
Permit numberpermitnumberThe number staff and applicants see, assigned by EnerGov from numbering the City sets up. Most are plain six-digit numbers; the rest start with a type prefix such as TOP-, ENC-, CRR-, PME- or ROOM-, in several layouts. Older records use forms like PR10048.System-Generated/DerivedPMPERMIT PERMITNUMBER (Table confirmed)100%
Permit typepermittypeThe kind of permit. The City has set up 30 types, including several that are not building permits at all, such as collision reports, room rentals and incentive programs.City-ConfiguredPMPERMITTYPE (Table confirmed)100%
Permit type grouppermittypegroupGrouping of permit types used for reporting, such as PME Permits or Public Works Permits. Missing on one permit in five.City-ConfiguredPMPERMITTYPE (group) (Probable)80.1%
DistrictdistrictDistrict the record falls in. Before mid-2024 almost every record carries the value 'Rancho Cordova'; since July 2024 most carry District 1 to 5. Older records were not updated to a numbered district.City-ConfiguredDISTRICT (Table confirmed)100%
ZoningmainzoneZoning designation of the main parcel, such as RD 5 or LDR (SCSP).City-ConfiguredZONE (Table confirmed)71%
Project nameprojectnameName of the larger project the record belongs to, if any.Tyler StandardPRPROJECT NAME (Table confirmed)1.1%
Project numberprojectnumberNumber of the larger project the record belongs to. Links permits and plans that share a project.Tyler StandardPRPROJECT PROJECTNUMBER (Table confirmed)1.1%
Permit statuspermitstatusWhere the permit stands now. The City uses 26 statuses, some of them its own, such as 'In Punch List' and 'Warranty Accepted – Closeout Items Due'.City-ConfiguredPMPERMITSTATUS (Table confirmed)100%
Status means cancelledisstatuscancelledYes when the current status is one the City marked as cancelled. Always No here because this export leaves out voided permits.System-Generated/DerivedPMPERMITSTATUS (flag column name not seen) (Table confirmed)100%
Status means completedisstatuscompletedYes when the current status is one the City marked as completed. Statuses with this flag: Final (17,158), Completed Project (2,677), Denied/Opt Out (28).System-Generated/DerivedPMPERMITSTATUS (flag column name not seen) (Table confirmed)100%
Status means failedisstatusfailureYes when the current status is one the City marked as a failure, such as denied. Statuses with this flag: Denied (114).System-Generated/DerivedPMPERMITSTATUS (flag column name not seen) (Table confirmed)100%
Status means on holdisstatusholdYes when the current status is one the City marked as a hold status. The City's setup puts Admin Closed and Expired in this group, so it covers far more than permits on hold. Statuses with this flag: Admin Closed (4,282), Expired (3,459), Fees Due (242), On Hold (63), Plan Approval Expired (12), Stop Work Order (4).System-Generated/DerivedPMPERMITSTATUS (flag column name not seen) (Table confirmed)100%
Status means issuedisstatusissuedYes when the current status is one the City marked as issued. Statuses with this flag: Issued (3,635).System-Generated/DerivedPMPERMITSTATUS (flag column name not seen) (Table confirmed)100%
Main parcel number (APN)mainparcelAssessor's parcel number of the permit's main parcel, almost always 14 digits. Joins to the parcel layer. A few hold placeholders such as 00000000000000.Tyler StandardMAILINGADDRESS on the main address (likely) PARCELNUMBER (Probable)83.5%
House numberaddressline1Street number of the record's main address.Tyler StandardMAILINGADDRESS (via PMPERMITADDRESS for permits) (Table confirmed)83.5%
Direction before streetpredirectionDirection that comes before the street name, such as the N in N Mather Blvd.Tyler StandardMAILINGADDRESS PREDIRECTION (Table confirmed)0.8%
Street nameaddressline2Street name of the main address, without the street type.Tyler StandardMAILINGADDRESS ADDRESSLINE2 (Table confirmed)83.2%
CitycityCity of the main address. Includes mailing cities such as Sacramento and Mather, not only Rancho Cordova.Tyler StandardMAILINGADDRESS CITY (Table confirmed)83.2%
StatestateState of the main address.Tyler StandardMAILINGADDRESS STATE (Table confirmed)83.1%
Street typestreettypeStreet suffix such as WAY, DR or BLVD. Entered in mixed case (WAY and Way both appear).Tyler StandardMAILINGADDRESS STREETTYPE (Table confirmed)82.9%
Direction after streetpostdirectionDirection that follows the street name. Almost never used in Rancho Cordova.Tyler StandardMAILINGADDRESS POSTDIRECTION (Table confirmed)0%
Unit or suiteunitorsuiteApartment, unit or suite number.Tyler StandardMAILINGADDRESS UNITORSUITE (Table confirmed)5.4%
Address line 3addressline3Extra address line, such as an attention line.Tyler StandardMAILINGADDRESS (Table confirmed)0%
Work classpermitworkclassThe kind of work within a permit type, such as New (Master Plan) or Encroachment. Work class drives fees and workflow in EnerGov.City-ConfiguredPMPERMITWORKCLASS (Table confirmed)100%
Application dateapplicationdateWhen the permit was applied for. Recorded to the second.Tyler StandardPMPERMIT APPLYDATE (Table confirmed)100%
Issued dateissueddateWhen the permit was issued.Tyler StandardPMPERMIT ISSUEDATE (Table confirmed)89.7%
Expiration dateexpirationdateWhen the permit expires unless work is finished or the permit is extended.Tyler StandardPMPERMIT EXPIREDATE (Table confirmed)80.7%
Final datefinaldateWhen the permit was finaled (work approved as complete).Tyler StandardPMPERMIT FINALIZEDATE (Table confirmed)67.2%
Last inspection datelastinspectiondateDate of the most recent inspection on the permit, usually set from inspection results. 913 older permits share the same date (Feb. 28, 2025), which looks like a bulk update.System-Generated/DerivedPMPERMIT LASTINSPECTIONDATE (Table confirmed)68%
ValuationpermitvaluationDeclared value of the work, in dollars. Zero on about a quarter of permits, mostly types where value doesn't apply.Tyler StandardPMPERMIT VALUE (Table confirmed)100%
Square footagesquarefootageArea of the work, in square feet. Zero on most permits.Tyler StandardPMPERMIT SQUAREFEET (Table confirmed)100%
Balance duebalancedueFees still owed on the record. Calculated from the record's fees and payments.System-Generated/DerivedCACOMPUTEDFEE (fees); payments table to confirm (Probable)100%
Amount paidamountpaidTotal fees paid on the record. Calculated from the record's fees and payments.System-Generated/DerivedCACOMPUTEDFEE (fees); payments table to confirm (Probable)100%
DescriptiondescriptionFree-text description of the work or request, typed by staff or the applicant. Some entries contain formatting tags, likely from text pasted into a rich-text field.Tyler StandardPMPERMIT (Table confirmed)98.4%
Assigned staff memberassigneduserStaff member the record is assigned to. Names are left out of this guide; counts only.Tyler StandardUSERS (Table confirmed)79.1%
Full addressaddress_concatenatedThe address parts joined into one line for display and mapping. Built by the export.System-Generated/DerivedData & Insights export (Added by the export)83.6%
Address locationgeocoded_columnMap point for the full address, geocoded by the export.System-Generated/DerivedData & Insights export (Added by the export)82.8%
Public portal linkcss_record_urlLink to the record in the City's Citizen Self Service portal. Built from the record's ID.System-Generated/DerivedData & Insights export (Added by the export)100%
Staff system linkenergov_urlMeant to link to the record in the staff EnerGov system. Always empty in the public export.UndeterminedData & Insights export (Added by the export)0%
Zoning help linkzonelearnmoreThe same link on every row, to the City's 'check zoning' page. A constant added in the public export, not an EnerGov data element.System-Generated/DerivedData & Insights export (Added by the export)100%
Parcel locationparcel_pointMap point for the main parcel. Built by the export from the parcel layer.System-Generated/DerivedData & Insights export (Added by the export)83.4%